Support Practice / Physical Teardown, Should-Costing & VAVE

Teardown, Benchmarking, VAVE & Localization Engineering

Systematic EV vehicle, battery pack, eAxle/motor, thermal manifold, harness, and PCB cross-section teardowns paired with bottom-up BOM should-costing, VAVE mass/cost reduction, and domestic Build-to-Print (BTP) supplier localization.

Pack to PCB
Structural packs, motors, valves & micro-sections
Should-Cost
Material, process, tooling & assembly-time models
VAVE Ideas
Part consolidation, scrap cut & mass reduction
Domestic BTP
4-tier localization & alternate-source qualification
Benchmarking & VAVE Physical & Soft Teardown PCB Cross-Section & CT Scan Should-Costing & BTP Localization

Complete Teardown, Should-Costing, VAVE & Localization Matrix

Actionable competitive intelligence across electronics, e-motors, structural battery packs, multi-loop thermal architectures, and domestic supply-chain localization.

Electronics teardown, benchmarking, BOM analysis and part localization

Comparison & Soft Study

  • Multi-Competitor Feature, Weight, Size & Cost Matrixing
  • E/E Topology, Zonal Consolidation & Bus Architecture Comparison
  • Multi-Mode Heat-Pump & Refrigerant/Coolant Loop Soft Benchmarking
  • Cell-to-Pack (CTP) Gravimetric & Volumetric Energy-Density Studies
  • Patent-Aware Architecture & Control-Logic Strategy Analysis

Physical Teardown

  • Full-Vehicle, eAxle, Traction Motor, Inverter & Structural Pack Teardowns
  • Step-by-Step Disassembly Sequence, Fastener Count & Process Timing
  • Laser-Welded Busbar, Flex-PCB BMS, Potting & Side-Cooling Teardown
  • 3D Scanning & Internal Cross-Section Construction Analysis of Valves/Castings
  • Stator Lamination Nesting, Rotor Spindle & Die-Cast Sealing Analysis

Electronics & PCB Analysis

  • Multi-Layer PCB Stack-Up Micro-Sectioning & Copper Weight Measurement
  • Active IC, Power Module (SiC/GaN/IGBT), Gate-Driver & Discrete BOM
  • HV Galvanic Isolation, Shunt/Hall Sensing & Protection Circuit Tracing
  • Supplier Share Breakdown & Critical Semiconductor Lead-Time Mapping
  • Thermal Pad, Cold-Plate Interface & EMC Shielding Construction Review

Should-Costing & VAVE

  • Bottom-Up Material, SMT/PCBA, Machining, Casting & Assembly Should-Cost
  • OEM vs. Tier-1 Process-Time, Overhead, Scrap & Tooling Estimation
  • VAVE Workshop Idea Generation for Mass, Part-Count & Cost Reduction
  • Cross-Platform Part Rationalization, Commonization & DFM/DFA Redesign
  • Empirical Energy-Flow, Efficiency & Thermal Derating Characterization

Domestic Localization

  • 4-Tier Domestic Build-to-Print (BTP) vs. Import-Content Classification
  • Target-Market Ambient Climate, Road Load & AIS/BIS Spec Adaptation
  • Pin-to-Pin & Functional Alternate Semiconductor / Passive De-Risking
  • Domestic Casting, Stamping, Busbar, Harness & PCBA Vendor Qualification
  • Localization Engineering Drawings, DVP&R, PPAP & Series Handover
Teardown & Costing Methods: PCB Micro-Sectioning & X-Ray / CT Analysis 3D Metrology & CAD Reconstruction Bottom-Up BOM & Process Should-Costing DFM / DFA & Stamping Nesting Analysis Domestic BTP Supplier Qualification
Discuss Teardown / VAVE Scope
Delivered Benchmarking & VAVE Studies

Teardown, Should-Costing & Localization Case Studies

Delivered physical and functional teardowns across 81.2 kWh 4680 structural battery packs, 14-mode heat-pump manifolds, HV sensing PCBs, integrated drive motors, 75 kW stator/rotor assemblies, and EV BTP localization programs.

View in Master Catalog
Structural Pack Metrics
66% CTP Mass | 182 Wh/kg
Cell-to-pack mass ratio, potting, laser-welded busbars, flex-PCB BMS & side-cooling teardown
Thermal Architecture Depth
14 Operating Modes Mapped
Sub-zero heat-pump scavenging, supercharging cooling & 8-channel valve internal CT scan
Granular Should-Costing
IC / Discrete BOM + Process Min
PCB layer cross-sections, supplier share breakdown, assembly step-times & manufacturing cost
Localization Execution
4-Tier BTP Feasibility
Immediate domestic BTP cost-down parts separated from 2-3 yr tooling & global safety ASICs
Delivered Case Studies Selected Teardown, Should-Cost & Localization Case Studies
For more case studies & details, contact us.Open Full Benchmarking Catalog
Pack Teardown 81.2 kWh | 4680 Structural CTP
81.2 kWh Cylindrical 4680 Structural EV Battery Pack Teardown and Potting Analysis

81.2 kWh Cylindrical 4680 Structural Battery Pack Teardown

Full physical teardown of a 340V, 828-cell (92s9p, 4 full-length modules) 445 kg structural pack achieving 182 Wh/kg pack density and 66% cell-to-pack mass ratio, detailing structural pink potting foam, tailor-welded top cover, 38 body/casting bolts, snap-fit side cooling tubes, and laser-welded busbars.

View Full Case Study
Thermal & CT Study 14-Mode Heat Pump & 8-Ch Valve
8-Channel Coolant Valve 3D Chamber CAD and X-Ray CT Cross-Section Scan Study

14-Mode EV Heat-Pump Architecture & 8-Channel Valve CT Scan

Mapped all 14 heating, defogging, heat-recovery, and fast-charge cooling operating modes (>-10 C and <-10 C ambient) alongside sequential 2D/3D X-ray CT cross-sectional scan slices of the stepper-driven 8-channel aluminum / ultrasonic-welded PA66 coolant manifold.

View Full Case Study
PCB Teardown HV Sensing ECU | 6-Layer Stackup
High-Voltage Battery Sensing Module Annotated PCB Teardown on 1 cm Grid

HV Battery Sensing ECU PCB Micro-Section & Should-Costing

Component teardown and 6-layer FR4 micro-sectioning (0.15 mm min trace, 0.45 mm thru-via) of an isolated HV shunt/voltage acquisition ECU (16-bit CAN MCU, battery DAQ ASIC, quad/dual digital isolators & OptoMOS relay) with full IC/discrete BOM and supplier cost breakup.

View Full Case Study
Motor Teardown & Cost 75 kW / 350V Traction Motor
75 kW 350V EV Traction Motor Disassembled Components Workbench Teardown

75 kW / 350V Traction Motor Teardown, Stamping & Should-Costing

Full physical teardown and process-minute should-cost model across stator/rotor assemblies (47.73 kg), analyzing 6-segment interlocking stator laminations that cut electrical-steel scrap, hollow stepped-diameter rotor shaft geometry, and dual-O-ring helical coolant jackets.

View Full Case Study
Benchmarking & VAVE Scoping

Planning a Competitor Teardown, BOM Cost-Down, or Domestic Localization Drive?

Share your target benchmark sample, cost/mass target, or localization BOM with our VAVE Leads:

Battery, Motor, Inverter & ECU Teardown PCB Stack-Up Micro-Sectioning Bottom-Up Should-Cost Models VAVE Mass & Part Consolidation Alternate Silicon De-Risking Domestic BTP Supplier Qualification
Discuss Benchmarking / VAVE All Benchmarking Cases
Teardown, VAVE & Localization Inquiry

Request a Benchmarking or VAVE Proposal

Select Physical Teardown, Should-Costing & VAVE, Domestic BTP Localization, or the General tab below.

Required *

0 / min 20 chars

20 to 3,000 characters. Omit confidential BOM pricing until mutual NDA is executed.

Confidential review by GMS Principal Architects under ISO 27001 controls.